The ECC800 is the core component of local management of the micro-module, and the access of its southbound components can be extended through the POE bus.

On the NETECO interface, a module can only bind () ECC800 devices.

What are the steps to maintain the electrode humidifier when the NETCOL5000-A removes the air conditioner humidifier? (Multiple choice)

正解:A,B,C,D 解答を投票する
The host should be set to () when the UPS5000 series multi-rack network is paralleled.

The anti-seismic components of UPS5000 are suitable for earthquake-prone areas, and can effectively support cabinets and prevent cabinets from tipping when earthquakes with intensity 9 or below occur.

Which of the following certifications has the PDU8000 precision power distribution cabinet passed? (Multiple choice)

正解:A,B,C,D 解答を投票する
Before installing the indoor unit of the air-cooled air conditioner, the fixed sheet metal parts of the compressor need to be removed.

What are the possible reasons for the failure of the humidification function of the NETCOL5000-A air conditioner? (Multiple choice)

正解:B,C,D 解答を投票する
What can users do through the ECC800WEB interface? (Multiple choice)

正解:A,B,C,D 解答を投票する
Which of the following requires a cooling tower or drycooler?

Batteries of different capacities, different specifications, different batches and different manufacturers cannot be mixed in the same group of batteries.

In the FusionModule2000, if a device port complies with the Modbus RTU protocol, which device is used to connect to smart ETH gateway?

The () air supply method is suitable for data centers with high power density of a single cabinet.