API-510試験無料問題集「API Pressure Vessel Inspector 認定」

Explain the API-510 provisions regarding the frequency and extent of inspections required after a pressure vessel has been altered or repaired.
正解:
API-510 requires that pressure vessels undergo rigorous inspections following any repairs or alterations to ensure the integrity of the vessel is maintained. The standard stipulates that these vessels should be inspected immediately after the work is completed and before they are returned to service.
The type of inspection can vary but typically includes non-destructive testing (NDT) to verify the quality of the repair or alteration and to confirm that no additional damage was introduced during the process.
What is the API-510 recommendation for frequency of internal inspections for vessels containing corrosive substances?

Which of the following does API-510 specifically require to be assessed during an external inspection?

An in-service vessel is being repaired or altered.
If there is a conflict between the requirements of API 510 and the legal jurisdiction, which should be followed?

Which factor is not considered when determining the inspection intervals for pressure vessels according to API-510?

Under API-510, which type of inspection is mandatory after the alteration of a pressure vessel?

Under which of the following condition(s) should you require the removal of safety relief device(s)?

Discuss the role of API-510 in disaster recovery planning for facilities with pressure vessels.
正解:
API-510 plays a vital role in disaster recovery planning for facilities with pressure vessels by providing guidelines on emergency inspection and assessment protocols that need to be followed after a disaster. This includes immediate assessment of potential damage to vessels, implementation of temporary safety measures, and detailed inspections to determine the impact on the structural integrity of the vessels. API-510 also advises on the documentation and reporting procedures that are crucial for effective recovery planning, helping facilities resume safe operations as quickly and safely as possible.
In API-510, what is the minimum required interval for external inspections if no RBI (Risk-Based Inspection) is implemented?

What does API-510 require to verify a welder's qualifications when welding on a pressure vessel?