CRE試験無料問題集「ASQ Certified Reliability Engineer (CRE) 認定」

It is reliability's job to see that all the tasks outlined in the reliability program are:
Response:

Which of the following techniques is MOST efficient when two nuisance variables are to be averaged out in an experimental design?
Response:

Which of the following activities is MOST effective in increasing reliability during a product's life cycle?
Response:

The investment in automated test equipment is often justified under which of the following circumstances Response:

A system has components connected in active parallel. At least n - 1 of the components must operate for the system to function properly. Suppose the time to failure of each component has an exponential distribution with the same failure rate λ. The mean time to failure of this system is:
Response:

Which of the following is NOT considered good practice in reliability design?
Response:

What percentage of the material is expected to fail?
Response:

Derating parts in specific applications is performed in order to:
Response:

Which of the following is the MOST effective technique for prioritizing critical factors for problem- solving?
Response:

Derating enhance reliability in all of the following ways EXCEPT by
Response:

Feedback channels for the planning, management and assessment of product safety should include:
I. Both official and unofficial sources.
II. Phone, fax, mail and questionnaire sources.
III. Captured company process information.
Response:

When failed field item are returned for failure investigation, which of the following steps should be taken first?
Response:

What are the life cycle costs for a new stamping machine purchased by a metal fabrication plant?
Pertinent cost data follows:
Purchase Price = $230,000
Repair Costs = $107,000
Post Purchase Costs = $870,000
Start Up Costs = $125,000
Maintenance Costs = $420,000
Energy Costs = $325,000
Response:

A certain equipment has a MTBF of m = 300 hours. Assuming an exponential distribution of time to failure, what is the maximum time of allowable operation if a reliability of 0.999 is required?
Response:

The reliability of a complex system can BEST be improved by:
Response:

Reliability data is rarely complete. 50 units are placed on test for 50 hours. During the test several units fail. The remaining units are removed from testing at that point.
Which of the following type(s) of censoring has (have) occurred?
I. Right censoring.
II. Single censoring.
III. Time censoring.
IV. Type I censoring.
Response:

When performing trade-offs in evaluating parts for reliability, which of the following is LEAST important?
Response:

A product - design team is in the material-selection phase for a new product. The following four treatments need to be considered:

What is the maximum number of treatment combinations?
Response: