Which of the following techniques will improve the accuracy of data collection the most?

解説: (GoShiken メンバーにのみ表示されます)
An effective listener is defined as someone who

解説: (GoShiken メンバーにのみ表示されます)
In a Scrum project, who is responsible for determining the time estimates during the project?

解説: (GoShiken メンバーにのみ表示されます)
The diagram below corresponds to a 100-lme; high-level language program with a single loop that can be executed no more than 20 times.

If this program was exhaustively tested, approximately how many possible paths would be executed0

解説: (GoShiken メンバーにのみ表示されます)
A strong customer feedback management process primarily helps an organization improve

解説: (GoShiken メンバーにのみ表示されます)
The following graphs illustrate the arrival rate and current status of software defects during system test. Which of these graphs indicates a product that is most ready for formal release to the customer?

解説: (GoShiken メンバーにのみ表示されます)
During concurrent development., a user reported a problem with Version 1 of the software product. A software quality engineer determined the problem originated m Version 2 of the product. Which of the following actions would be most appropriate for the software quality engineer to take first to fix the problem?

解説: (GoShiken メンバーにのみ表示されます)
Software configuration status accounting is the process of

During what time period is the software configuration management plan implemented?

解説: (GoShiken メンバーにのみ表示されます)
Which of the following items is an appropriate topic to be discussed in a daily scrum meeting?

解説: (GoShiken メンバーにのみ表示されます)