"A calculated time frame that matches customer demand" is a definition of what Lean Principles term?

Early in a project a Belt will want to begin to identify and evaluate risk factors for the subject process and will therefore begin building a(n) ______________.

If in an experiment all possible variable pairs sum to zero the design is Orthogonal.

If a Six Sigma project was to reduce repair station inventory and the team found the inventory was creeping up over time which Lean tools should be considered in the Control Phase to reestablish and sustain the project success?

One of the primary deliverables from performing a SIPOC is to begin to understand which outputs have the greatest affect on the customer most valued inputs.

Which of these might contribute to similar distributions having Unequal Variance?

A fundamental rule is that both Standard Deviation and Variance can be added.

The two types of data that can be used in Statistical Analysis are Attribute and Variable.

Range Charts are the technique used to determine if Special Causes are occurring within the subgroups of the ______________.

An operator checks that all boxes being packed contain enough products to fill the box. However, each box getting filled has a different number of products in it. This is a Reproducibility problem, not a Repeatability problem.

The primary objective in removal of waste is to improve the Order Production Cycle where the time from _________________ to the time of receipt of payment is compressed.

A valid mathematical Regression represents all of the characteristics shown except ___________________________.

Control Charts were developed by Dr. Shewhart to track data over time. To detect Special Cause variation the Control Charts use which of these?

A Belt working in a supply chain environment has to make a decision to change suppliers of critical raw materials for a new product upgrade. The purchasing manager is depending on the Belt's effort requiring that the average cost of an internal critical raw material component be less than or equal to $3,600 in order to stay within budget. Using a sample of 42 first article components, a Mean of the new product upgrade price of $3,200 and a Standard Deviation of $180 was estimated. Based on the data provided, the Z value for the data assuming a Normal Distribution is?

Much of the Six Sigma methodology is used to identify and remove causes for _____________ .

Which statement(s) are correct about the Pareto Chart shown here for the DOE analysis? (Note: There are 2 correct answers).

Which statement(s) are correct about the Pareto Chart shown here for the DOE analysis? (Note: There are 2 correct answers).

The validity of the decision made with Hypothesis Testing is dependent upon all of the following except ______________________.

Which of these are examples of business metrics or Key Performance Indicators commonly referred to as KPI's?