Your consulting firm has recently been hired to complete a site survey for a company desiring an indoor coverage WI-AN. Your engineers use predictive design software for the task, but the company insists on a pre-design site visit.
What task should be performed as part of the pre-design visit to prepare for a predictive design?
What task should be performed as part of the pre-design visit to prepare for a predictive design?
正解:B
解答を投票する
ABC Company is planning to install a new 802.11ac WLAN, but wants to upgrade its wired infrastructure first to provide the best user experience possible. ABC Company has hired you to perform the RF site survey.
During the interview with the network manager, you are told that the new Ethernet edge switches will support VoIP phones and 802.11 access points, both using 802.3 PoE.
After hearing this information, what immediate concerns do you note?
During the interview with the network manager, you are told that the new Ethernet edge switches will support VoIP phones and 802.11 access points, both using 802.3 PoE.
After hearing this information, what immediate concerns do you note?
正解:B