D-PSC-MN-01試験無料問題集「EMC Dell PowerScale Maintenance 認定」

A platform engineer is connecting a new Dell PowerScale F600 node to the frontend switch in an existing cluster with legacy nodes.
How should the network cables be connected?

解説: (GoShiken メンバーにのみ表示されます)
An organization has a cluster of F800 nodes running OneFS version 9.0. A platform engineer is planning to add a new node pool of F600 nodes. While unpacking the first F600 node, the IT manager notices two of the ten drive bays are empty and asks the platform engineer about it.
How should the platform engineer respond?

Exhibit.

A platform engineer has connected power cables to a Dell PowerScale Gen6 node.
What does the status indicator indicate?

解説: (GoShiken メンバーにのみ表示されます)
Which tool is essential for completing a PowerScale cluster configuration that is compliant with specific industry standards?

Dell EMC Technical Support has requested a part to be sent directly back to Dell Logistics to be studied.
Which process or document needs to be completed prior to sending the part back?

解説: (GoShiken メンバーにのみ表示されます)
What is the recommended way to install a Dell PowerScale Gen 6 compute module in a chassis?

What must be replaced at the same time the backup battery is replaced?

解説: (GoShiken メンバーにのみ表示されます)
What is a critical consideration when replacing a network card, a key CRU, in a PowerScale node?

During the process of adding a node to a PowerScale cluster, what does smartfailing a node entail?

A platform engineer has added an F200 node to a Dell EMC PowerScale cluster. The cluster now has five F200 nodes.
Before leaving the site, what action must the engineer perform?

解説: (GoShiken メンバーにのみ表示されます)