DES-4421試験無料問題集「EMC Specialist - Implementation Engineer, PowerEdge MX Modular 認定」
An administrator is asked to install and power-on a new MX740c sled in an MX7000 chassis. The administrator inserts the sled and presses the power button. They notice that the power button LED is blinking green. After a short time power button turns to solid green and the server finally turns on.
What operation was in progress when the power button was blinking green?
What operation was in progress when the power button was blinking green?
正解:C
解答を投票する
A company receives their first MX7000 chassis. They connect all the provided power supply cables into two different PDUs on different power grids for redundancy. Each of the six power supplies is cabled and has green LEDs. One Management Module is present along with all system fans. Grid redundancy is configured as the power redundancy mode. The chassis is fully populated with six compute sleds and one IOM but only two of the six sleds will power on.
What is the possible reason for this issue?
What is the possible reason for this issue?
正解:A