An administrator is asked to install and power-on a new MX740c sled in an MX7000 chassis. The administrator inserts the sled and presses the power button. They notice that the power button LED is blinking green. After a short time power button turns to solid green and the server finally turns on.
What operation was in progress when the power button was blinking green?

A company receives their first MX7000 chassis. They connect all the provided power supply cables into two different PDUs on different power grids for redundancy. Each of the six power supplies is cabled and has green LEDs. One Management Module is present along with all system fans. Grid redundancy is configured as the power redundancy mode. The chassis is fully populated with six compute sleds and one IOM but only two of the six sleds will power on.
What is the possible reason for this issue?

Where is a valid storage location for extracting the full MX7000 chassis logs package?

After installing a supported OS from a bootable ISO on an MX740c sled, an administrator discovers that not all the hardware is property detected by the OS. They plan to reinstall the OS.
What should the administrator do to resolve this issue through OS installation?

What is a valid option when resetting iDRAC to factory defaults?

Which command(s) is supported in the current PowerEdge MX Redfish implementation?