A potential customer is considering replacing a four year old, Linux-based NFS server with 40TB of usablecapacity. The existing system supports home directories, an internal website, and a content repository for thecustomer's content management system. The customer is concerned about performance of any new solutionbecause they expect to double workload in the content management system.
正解:D
解答を投票する
Your customer purchased an Isilon cluster with eight X400 nodes for Home Directories. Your follow-updiscussions have uncovered an opportunity to expand the cluster to support the Legal Department. As youprepare to complete the Workflow Profile Document, you meet with the customer to discuss data
protection.Which key areas should you address?
protection.Which key areas should you address?
正解:B
解答を投票する
Your customer manages a print media environment, consisting of three Isilon clusters, which are out ofsupport. The customer would like to have access to new software releases and feature sets. You have beenasked to perform a full discovery of the customer's environment.
The customer's current Isilon clusters are as follows:
"Cust" (12 x 12000X) serves as upload media storage for different tenants.
Complete collection of E20-357 Exam's Questionand answers.
"Working" (8 x 12000X + 6 x X200) serves as a working zone for extraction to RAW and printing media from it.
"Archive" (16 x 72NL + Accelerator nodes) is used to store printed content for six months. The customer operates in a Windows environment using SMB 2.0, two DNS servers per AD forest, threeforestdomains which are servicing three different environments. All servers are operating on a 1Gb network, threeVLANs segregating the DEV/QA/PROD environments. Currently, there is no monitoring in place forperformance measurement or optimization.
The requirements for this solution include:
* Better ROI and TCO
* Maintain same performance with possible improvements
* Renew HW/SW and get inclusive support
* Limit migrations
* Reduce space, power, cooling consumption
* Get new feature sets
* If migration required, use Parallel copy (multiple nodes, multiple threads, multiple
connections)
* Segregate tenant shares from other tenants
* Expand up to 1PB of total storage
What steps need to be taken on the clusters to meet the customer requirements?
The customer's current Isilon clusters are as follows:
"Cust" (12 x 12000X) serves as upload media storage for different tenants.
Complete collection of E20-357 Exam's Questionand answers.
"Working" (8 x 12000X + 6 x X200) serves as a working zone for extraction to RAW and printing media from it.
"Archive" (16 x 72NL + Accelerator nodes) is used to store printed content for six months. The customer operates in a Windows environment using SMB 2.0, two DNS servers per AD forest, threeforestdomains which are servicing three different environments. All servers are operating on a 1Gb network, threeVLANs segregating the DEV/QA/PROD environments. Currently, there is no monitoring in place forperformance measurement or optimization.
The requirements for this solution include:
* Better ROI and TCO
* Maintain same performance with possible improvements
* Renew HW/SW and get inclusive support
* Limit migrations
* Reduce space, power, cooling consumption
* Get new feature sets
* If migration required, use Parallel copy (multiple nodes, multiple threads, multiple
connections)
* Segregate tenant shares from other tenants
* Expand up to 1PB of total storage
What steps need to be taken on the clusters to meet the customer requirements?
正解:A
解答を投票する
A customer is purchasing a 5-node Isilon X400 cluster for an HPC application running on Linux. The customercurrently has 10 HPC nodes and will persistent mount the Isilon cluster through NFSv3. Which recommendedconfiguration addresses the customer's requirements for high availability and throughput?
正解:B
解答を投票する