A computer room has a net volume of approximately 2,500 m³ / 88,287 ft³.
The temperature is 20 °C / 68 °F.
The required design concentration is 7%.
The S-Factor is 0.1359 (metric) / 1.885 (imperial).
Calculate the amount of gas required for this computer room based on FM200. What is the correct weight?

解説: (GoShiken メンバーにのみ表示されます)
The data center has been in operation for about 1 year and 2 months. The dust levels in the computer room are relatively high.
What is the most likely root cause?

解説: (GoShiken メンバーにのみ表示されます)
The electrical diagram of the data center shows the following UPS configuration and has a load of 80 kW.
What is the set-up in this data center?

解説: (GoShiken メンバーにのみ表示されます)
The location of a data center is just above the Arctic Circle (North Pole). The outside air temperature is never above 21°C/70°F.
Taking energy efficiency as the highest priority, which cooling system should you recommend?

解説: (GoShiken メンバーにのみ表示されます)
The noise levels in the data center are approximately 91 dB (A).
Do employers need to take precautions?

解説: (GoShiken メンバーにのみ表示されます)
The computer room has high levels of H2S gas contamination. What is the best option to resolve this issue?