HPE0-J58試験無料問題集「HP Designing Multi-Site HPE Storage Solutions 認定」

A customer is Interested in an HPE storage solution. The customer's current solution requites installation of host software to make advanced storage array features available to hosts.
You propose a solution consisting of two HPE 3PAR arrays using Remote Copy and Peer Persistence
What should you emphasize during your presentation?

A customer has an HPE Nimble Storage array. They plan to add a second HPE Nimble Storage array to their existing group.
What is the expected write behavior to a volume once the new array is added to the same pool as the existing array?

A customer needs to replicate multiple HPE 3PAR source arrays to a single HPE 3PAR target array at a Disaster Recovery sue.
What is required to support a 31 fan-in for Remote Copy?

A customer needs a new replication solution that makes use of capacity efficiency technologies, even though data is being replicated to another array.
You have been developing a solution that includes two HPE 3PAR arrays. What should you emphasize in your proposal?

A customer configured the RCIP ports on two HPE 3PAR arrays, and cabled them to the respective networks. The remote copy links between the arrays are established, and the remote copy service Is started successfully. The customer wants to ensure they have a latency lower than 5 ms and can support a throughput of 8 Gb/s.
What should you do to verify the links are correctly sized to support the replication bandwidth required?

You are discussing a HPE 3PAR Remote Copy solution with your customer. The customer has had a bad experience in their current non-HPE replication solution. Currently the source and target volume properties on the array must be identical on both sides and cannot be changed without re-creating the volumes.
What should you explain to the customer?

What is one of the advantages of protecting HPE 3PAR File Persona with RMC?

Refer to the exhibit.

A customer asks you to design an HPE 3PAR 9450 solution with 64 3 84 TB SSDs using RAID 6 (6+2). The customer does not want to lose data It an entire drive enclosure Is lost
What must be added to the Bill of Materials shown to meet these requirements?

A customer has a two-node HPE 3PAR array with three additional drive enclosures. There is a single CPG setup for RAID 5 (3+1). One of the drive enclosures has failed and must be replaced.
What needs to be considered before starling the repair?

A customer wants an HPE 3PAR array with about 400,000 IOPS and over 6000 MBs per second through - put at 16K block size. What should you consider in your design?