HPE0-S58試験無料問題集「HP Implementing HPE Composable Infrastructure Solutions 認定」
An integrator has installed a new Synergy frame into a rack with two existing Synergy frames in a customer's environment.
Click where the integrator should verify that the cabling for the management ring was completed correctly.

Click where the integrator should verify that the cabling for the management ring was completed correctly.

正解:

Reference:
https://support.hpe.com/hpsc/doc/public/display?docId=a00048164en_us