H13-624_V5.0試験無料問題集「Huawei HCIP-Storage V5.0 認定」
In the HyperMetro active-active data center solution, before configuring the active-active pair, the active-active domain needs to be configured. The active-active domain is a logical concept, which can include two sets of storage arrays and arbitration servers that need to create an active-active relationship.
正解:B
解答を投票する
Operation and maintenance engineer A inquire about the process of hardware trusted and secure boot in Huawei's all-flash storage manual. Which of the following sequence is correct?
1.Verify Grub's signature public key
2.Verify the status of the software signing certificate
3.Verify and load Grub
4.Verify and load the OS
1.Verify Grub's signature public key
2.Verify the status of the software signing certificate
3.Verify and load Grub
4.Verify and load the OS
正解:D
解答を投票する