C72 is "a large-capacity archive node device with a height of 4U, but it can also be fully equipped with 272 SAS disks to accommodate one Some scenarios with relatively high performance and capacity requirements.
In the Huawei HyperMetro active-active solution, when the active-active data center link fails, priority sites can be submitted first Arbitration, so that the priority site will win the arbitration first, and can continue to provide host services
When using Huawei OceanStor Toolkit V100R001 to perform the inspection operation, which one of the following is not included in the inspection wizard? ()
A bank's production center and disaster recovery center both use Huawei's hyper-converged storage products. The two centers communicate Disaster recovery through asynchronous replication. The copied network type can support GE/10 GE/25 GE