A user deploys a backup system for the database business, the production volume capacity is
2TB, and the incremental data change is 20GB/day, which is retained for 1 month, and routine mount tests are performed quarterly.
When doing back-end capacity planning, if using advanced backup, which of the following options is close to the back-end capacity requirements?
2TB, and the incremental data change is 20GB/day, which is retained for 1 month, and routine mount tests are performed quarterly.
When doing back-end capacity planning, if using advanced backup, which of the following options is close to the back-end capacity requirements?
正解:B
解答を投票する
The distance between two computer rooms in the data center is 2 kilometers. The storage in computer room A and the storage device in computer room B need to be configured with remote replication. The two storage rooms can be directly connected by optical fibers without going through a switch.
正解:A
解答を投票する
The various businesses of the enterprise have different storage requirements and need to be finely divided. The customer hopes that different businesses can compete for physical space and achieve optimal configuration of space. Which of the following features can meet the requirements?
正解:D
解答を投票する
Customer M uses Huawei storage products to build an active/standby disaster recovery system.
The operation and maintenance personnel are required to periodically check and maintain the system, and the disaster recovery center is also required to conduct irregular disaster recovery tests to verify the effectiveness of the disaster recovery solution. feasibility. Which of the following statements about the operation of the customer's disaster recovery test is correct? (Multiple Choice)
The operation and maintenance personnel are required to periodically check and maintain the system, and the disaster recovery center is also required to conduct irregular disaster recovery tests to verify the effectiveness of the disaster recovery solution. feasibility. Which of the following statements about the operation of the customer's disaster recovery test is correct? (Multiple Choice)
正解:A,B,C,D
解答を投票する
The ________ system refers to the establishment of multiple sets of IT systems with the same functions in distant places, which can monitor the health status and switch functions between them.
正解:
Disaster Recovery