A. Site plan
B. Plot plan
C. Construction plan
D. Landscape plan
A. 52 in. (1,321 mm)
B. 41 in. (1,041 mm)
C. 44 in. (1,118 mm)
D. 48 in.(1,219 mm)
A. 1,500 gpm (5,6781pm)
B. 840 gpm (3,180 lpm)
C. 740 gpm (2,800 lpm)
D. 1,040 gpm (3,937 ipm)
A. 42 psi (290 kPa)
B. 20 psi(138kPa)
C. 80 psi(552kPa)D 120 psi(827kPa)
A. 40,000 ft2 (3,716 m2)
B. 50,000 tt2 (4,645 m2)
C. 52,000 ft2 (4,831m2)
D. 25,000 ft2 (2,323 m2)
A. Class B or C
B. Class A
C. Class A or B
D. Class B
A. (C)
B. (A) + (B)
C. (B)
D. (A)
A. 30 seconds
B. 60 seconds
C. 10 seconds
D. 90 seconds
A. revised drawings may be required by the AHJ.
B. no action is necessary on the part of the AHJ.
C. no action is necessary on the part of the applicant.
D. revised drawings must be submitted to the applicant.
A. Stakeholder input
B. A financial outcome
C. A prescriptive code requirement
D. Goals and objectives