You have successfully configured identity federation between Oracle Cloud Infrastructure (OCI) and Oracle Identity Cloud Services (IDCS). A new project manager wants access to OCI for her team and provides the name of an existing group within IDCS to use when granting access. How do you configure federation to allow the project team access to OCI resources?
正解:C
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
You are implementing Oracle Cloud Infrastructure (OCI) FastConnect to access OCI public access points (e.g. ?object storage). You want other Internet traffic from your on-premises environment to use your existing connection with your ISP.
What is the correct way to establish OCI FastConnect to access these OCI public endpoints?
What is the correct way to establish OCI FastConnect to access these OCI public endpoints?
正解:C
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
Your company has decided to move a few applications to Oracle Cloud Infrastructure and you have been asked to design it for Disaster Recovery (DR). One of the items of your design is to deploy the DR at least 300 miles from the home site and minimize the network latency as much as possible. Based on that, what will be the recommended deployment?
正解:B
解答を投票する
As the Cloud Architect for your company, you have been tasked with designing a high performance (HPC) cluster in Oracle Cloud Infrastructure (OCI). The following requirements have been defined:
The cluster must be a minimum of three nodes, but may increase to six nodes when demand requires.
The cluster must be resilient to any potential infrastructure failures. To minimize latency, all nodes must be deployed within the same availability domain (AD). Adding or replacing nodes within the cluster should take no more than 30 minutes. Which two steps should be performed to satisfy these requirements in OCI? (Choose two.)
The cluster must be a minimum of three nodes, but may increase to six nodes when demand requires.
The cluster must be resilient to any potential infrastructure failures. To minimize latency, all nodes must be deployed within the same availability domain (AD). Adding or replacing nodes within the cluster should take no more than 30 minutes. Which two steps should be performed to satisfy these requirements in OCI? (Choose two.)
正解:D,E
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
You have two line of business operations (LOB1, LOB2) leveraging Oracle Cloud Infrastructure.
LOB1 is deployed in VCN1 in the OCI US East region, while LOB2 is deployed in VCN2 in the US West region. You need to peer VCN1 and VCN2 for disaster recovery and data backup purposes.
To ensure you can utilize the OCI Virtual Cloud Network remote peering feature, which CIDR ranges should be used?
LOB1 is deployed in VCN1 in the OCI US East region, while LOB2 is deployed in VCN2 in the US West region. You need to peer VCN1 and VCN2 for disaster recovery and data backup purposes.
To ensure you can utilize the OCI Virtual Cloud Network remote peering feature, which CIDR ranges should be used?
正解:C
解答を投票する