1z0-1042-24試験無料問題集「Oracle Cloud Infrastructure 2024 Application Integration Professional 認定」
When creating a new Oracle Integration Cloud (OIC) Connection resource, there are several steps that must be done before it is fully configured and can be used in an integration flow. Which task is NOT required in order to transition a new Connection resource from the draft to the configured state?
正解:F
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
You are implementing a synchronous Oracle Integration (OIC) integration flow that processes file records within a While loop action. At the end of each loop, you want to delay processing of the next record for a certain period. Which is a valid consideration when using the Wait action in this scenario?
正解:C
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
In an Oracle Integration Cloud (OIC) project, you are asked to leverage a custom JavaScript library function to be used within an application-driven orchestration integration flow. Which set of steps should you follow to correctly use the JavaScript library within your OIC integration?
正解:A
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)