C-TPLM30-67試験無料問題集「SAP Certified Application Associate - Enterprise Asset Management (Maintenance & Repair) with SAP ERP 6.07 認定」

Which of the following is a function of deadline monitoring (transaction IP30)?

A maintenance plan has a completion requirement. The plan contains five maintenance items that produce five notifications.
Which system status must each notification have before the maintenance call is completed and the next maintenance call can be generated?

What are the prerequisites for order settlement? (Choose three)

正解:C,D,E 解答を投票する
A user has planned an operation with labor costs and material costs; however, the material cost element is not assigned to a value category.
Where do the material costs appear in the value categories for the order?

How many time-based cycles can you use in a multiple-counter maintenance plan?

How do you define operations for preventive maintenance tasks?

Which of the following control characters is available in the edit mask of the structure indicator?

Which of the following are maintenance work center functions? (Choose three)

正解:B,D,E 解答を投票する
What are the prerequisites for installing equipment at a functional location? (Choose two)

The view profile enables you to create a customized selection of tabs for use with technical objects.
Which Customizing step(s) must you perform to make a view profile available?