Which master data object governs the relationship between supply source and demand source in the Kanban process?

In the first step, you have created master recipes. In which sequence are the additional objects created?

The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging?

If you use floats to limit dispatching in capacity planning, what type of time element can be reduced by strategy settings while dispatching?

If the stock level drops below the reorder stock in reorder point planning, what is the system logic to trigger procurement?

What are the consequences if operation status Dispatched is set for a production order operation?

In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run? Note: There are 2 correct answers to this question.

You have a quality control check to avoid using a high-value component tin faulty materials in subsequent assembly operations. How do you account for potential scrap of the high-value material?

MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?

You want to create a production order from a planned order. What methods could you use? Note: There are 2 correct answers to this question.