When measuring sound pressure levels in a classroom to determine compliance with the HVAC background noise requirements of LEED Building Design and Construction: Schools, Indoor Environmental Quality Prerequisite, Minimum Acoustic Performance, what testing conditions are appropriate for the classroom?

解説: (GoShiken メンバーにのみ表示されます)
When the LEED AP is applying the Integrative Process to a Building Design and Construction project, when should the Owner's Project Requirements (OPR) be created and updated?

解説: (GoShiken メンバーにのみ表示されます)
An owner has insisted on using a non-native or non-adapted plant species on both the vegetated roof and ground level. What Sustainable Sites credit will this decision impact the most?

解説: (GoShiken メンバーにのみ表示されます)
A LEED Building Design and Construction: New Construction office building's HVAC system includes hot water from a central utility plant. The central utility plant is owned and operated by a management company.
The office pays a flat fee for hot water, included as part of the lease. The management company does not meter or invoice for actual hot water consumption. For the project to meet the requirements for Energy and Atmosphere Prerequisite, Building-Level Energy Metering, an energy meter must be installed for

解説: (GoShiken メンバーにのみ表示されます)
During the early stages of a LEED for Schools project, the team was able to reduce the number of lighting fixtures in classrooms by 25% because the project team selected paint color whose light reflectance value was
75% instead of the initially proposed 64% value. This strategy is an example of applying which of the following credits to the project?

解説: (GoShiken メンバーにのみ表示されます)
A new commercial building is being designed to use small capacity air handling units. To meet the requirements of the Carbon Dioxide Monitoring strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Environmental Quality Strategies, where would CO2 monitors need to be located?

解説: (GoShiken メンバーにのみ表示されます)
The LEED project has a main entrance and two service entrances in an alley behind the building. Which entrances need non-smoking signage and at what maximum distance from the door(s) can the non-smoking signage be posted?

解説: (GoShiken メンバーにのみ表示されます)
Which of the following is required when documenting a LEED Pilot credit?

解説: (GoShiken メンバーにのみ表示されます)
The Solar Reflectance Index (SRI) includes the measure of a material's

解説: (GoShiken メンバーにのみ表示されます)
When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following must be included in the Basis of Design (BOD)?

解説: (GoShiken メンバーにのみ表示されます)
Which of the following items must have safe collection, storage, and disposal for Materials and Resources Prerequisite, Storage and Collection of Recyclables?

解説: (GoShiken メンバーにのみ表示されます)
Which individual occupant lighting control meets the requirements of Indoor Environmental Quality Credit, Interior Lighting?

解説: (GoShiken メンバーにのみ表示されます)
The required minimum scope of analysis for a product-specific declaration that contributes toward Materials and Resources Credit, Building Product Disclosure and Optimization - Environmental Product Declarations, Option 1. Environmental Product Declaration is

解説: (GoShiken メンバーにのみ表示されます)
A topographic assessment of a project site located 150 ft. (45 m) from a water body was conducted. The results of the slope analysis show that the site is generally sloping 6% to 8% to the northwest over most of the site, with some steep slopes located at the eastern edge of the property, which may impact the runoff volume.
Which one of the following LEED credits or prerequisites will be affected by these results?

解説: (GoShiken メンバーにのみ表示されます)
For Energy and Atmosphere Credit, Advanced Energy Metering, what is the minimum amount of time that the metering system should store data?

解説: (GoShiken メンバーにのみ表示されます)
What type of project would benefit from showing compliance with Energy and Atmosphere Prerequisite, Minimum Energy Performance, Option 2. Prescriptive Compliance: ASHRAE 50% Advanced Energy Design Guide?

解説: (GoShiken メンバーにのみ表示されます)
A project has total waste of 20 tons (18.1 tonnes) that includes the following:
8 tons (7.3 tonnes) of recycled demolition steel and concrete
2 tons (1.8 tonnes) of trees cleared from the site
. 3 tons (2.7 tonnes) of commingled scrap with 40% diverted
. 6 tons (5.4 tonnes) of used furniture donated to a non-profit organization
1 ton (0.9 tonnes) of removed carpet and ceiling tiles sent back to the manufacturer What is the percentage of diverted waste for Materials and Resources Credit, Construction and Demolition Waste Management?

解説: (GoShiken メンバーにのみ表示されます)
Which of the following transit modes is considered to be walkable if it is within 1/2 mile (0.8 km) of the functional entry of a project?

解説: (GoShiken メンバーにのみ表示されます)
When a project team sustainably develops a project site, the design should

解説: (GoShiken メンバーにのみ表示されます)
Which of the following buildings meets the Minimum Program Requirements for LEED certification?