LEED-AP-BD-C試験無料問題集「USGBC LEED AP Building Design + Construction (LEED AP BD+C) 認定」
A neighborhood housing development organization has dual goals, promoting occupant's health and minimizing energy costs. What LEED Building Design and Construction, New Construction credit might the LEED AP propose to best achieve the organization's dual goals?
正解:D
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
A LEED Building Design and Construction: New Construction office building's HVAC system includes hot water from a central utility plant. The central utility plant is owned and operated by a management company. The office pays a flat fee for hot water, included as part of the lease. The management company does not meter or invoice for actual hot water consumption. For the project to meet the requirements for Energy and Atmosphere Prerequisite, Building-Level Energy Metering, an energy meter must be installed for
正解:A
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
What percentage of a building's surface area may be excluded from the calculation for Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 2. Renovation of Abandoned or Blighted Buildings because of deterioration or damage when maintaining existing building structure, enclosure and interior structural elements?
正解:A
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
During the early stages of a LEED for Schools project, the team was able to reduce the number of lighting fixtures in classrooms by 25% because the project team selected paint color whose light reflectance value was 75% instead of the initially proposed 64% value. This strategy is an example of applying which of the following credits to the project?
正解:D
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
A school project is located in a basin. Snow melts in the spring on the nearby mountains which replenishes the local water supply. The nearby highways are sometimes closed during the winter due to the winter storm. What is the top priority the project team should focus on?
正解:A
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
A topographic assessment of a project site located 150 ft. (45 m) from a water body was conducted. The results of the slope analysis show that the site is generally sloping 6% to 8% to the northwest over most of the site, with some steep slopes located at the eastern edge of the property, which may impact the runoff volume. Which one of the following LEED credits or prerequisites will be affected by these results?
正解:A
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
What LEED Building Design and Construction project type should exclude weekend transit service from the transit service level calculations for Location and Transportation Credit, Access to Quality Transit, if the project occupants do not commute to the building during weekends?
正解:D
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
An existing vacant office building will be completely renovated and new mechanical, electrical and plumbing systems will be installed. 20% of the building's gross floor area will be complete at the time of certification. There will be a data center and some retail stores on the ground floor of the building at a future date. Which rating system is applicable for the building?
正解:A
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)