Which of the following phases should be included in the Integrative Process Credit, Integrative Process in order to comply with the intent of this credit?

解説: (GoShiken メンバーにのみ表示されます)
Which sentence is true about Renewable Energy Certificates (RECs)?

解説: (GoShiken メンバーにのみ表示されます)
A photovoltaic (PV) system was installed after commissioning (Cx) was completed on a 35,000 ft2 (3 252 m2) project. What actions need to take place in order to meet compliance for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification?

解説: (GoShiken メンバーにのみ表示されます)
A Client is fitting out a building with area 20,500 ft2 (1 904.5 m2) and wishes to pursue the Energy and Atmosphere Credit, Enhanced Commissioning. Who may be appointed as the Commissioning Authority (CxA) for the project?

解説: (GoShiken メンバーにのみ表示されます)
In addition to the Material Type, what other information needs to be included in the Construction and Demolition Waste Management Calculation?

解説: (GoShiken メンバーにのみ表示されます)
The WaterSense label or local equivalent requirement in Water Efficiency Prerequisite, Indoor Water Use Reduction ensures that eligible newly installed plumbing fixtures will

解説: (GoShiken メンバーにのみ表示されます)
A project seeking to achieve Indoor Environmental Quality Credit, Low Emitting Materials has outdated certifications demonstrating that the wall and ceiling paint are low emitting materials. What should the LEED AP do?

解説: (GoShiken メンバーにのみ表示されます)
Which of the following appliances are included in Water Efficiency Prerequisite, Indoor Water Use Reduction?

解説: (GoShiken メンバーにのみ表示されます)
After the construction and installation of all finishes and furnishing of a new 36,000 ft2 (3 344.5m2) office space, what is the minimum total volume of outdoor air that is required during a non-phased flush-out procedure to achieve Indoor Environmental Quality Credit, Indoor Air Quality Assessment?

解説: (GoShiken メンバーにのみ表示されます)
Regarding the Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices, in addition to materials costs, what information is needed to determine the total cost of each product?

解説: (GoShiken メンバーにのみ表示されます)