Winch of the following fixtures, fillings, or appliances Is outside the scope of water use reduction calculations in Green in Infrastructure and Buildings Credit. Indoor Water Use Reduction?

解説: (GoShiken メンバーにのみ表示されます)
Winch of the following general strategies is acceptable under Neighborhood Pattern and Design Credit.
Reduced Parking Footprint?

解説: (GoShiken メンバーにのみ表示されます)
A projectsite Includes 3.500 ft. (1.067 m) of streets, excluding driveways and utility vaults. How many street trees must be planted to meet the minimum requirements or Neighborhood Pattern and Design Credit. Tree- Lined and Shaded Streetscapes. Option 1: Tree-Lined Blocks?

解説: (GoShiken メンバーにのみ表示されます)
Whichof the following sites meets the Minimum Program Requirements (MPR) fora project targeting LEED for Neighborhood Development certification?

解説: (GoShiken メンバーにのみ表示されます)
A mixed-use project without transit service has the following characteristics:
* 55 townhomes on 9 acres (3.6 hectares) of buildable land
* 44.000 ft2 (4.088 m2) of commercial building on 87.120 ft2(9.094.m2) Of buildable land What should be added to the development plan to meet the minimum density requirements for Neighborhood Pattern and Design Prerequisite Compact Development?

解説: (GoShiken メンバーにのみ表示されます)
A project intends to connect to the municipal graywater system Toward which of the following can this connection contribute?

解説: (GoShiken メンバーにのみ表示されます)
A developer has built a snow storage system that uses snow collected in the winter to cool water that serves the neighborhood central plant during the summer.Which credit will this system contribute to?

解説: (GoShiken メンバーにのみ表示されます)
What reference standard is used to determine compliance with Green Infrastructure and Buildings Prerequisite. Minimum Building Energy Performance when the whole building energy modeling option is used?

解説: (GoShiken メンバーにのみ表示されます)
A project team would like to attempt the credit Transit Facilities' and is working with the local transit agency to inventory the existing and proposed bus stops within the project boundary. Oi the five proposed bus stops, one stop will be in operation at the same time when the project completes, and two stops will be in operation in the second year alter the project's completion. The remaining two bus stops will be in operation m me third year after the project's completion. How many proposed bus stops can the project team Include in the application form to attempt the credit?

解説: (GoShiken メンバーにのみ表示されます)
What Is the maximum distance from the project's geographic center thata community garden outside the project boundary can be located in order to satisfy the requirement for Neighborhood Pattern and Design Credit,Local Food Production?