UiPath-ARDv1試験無料問題集「UiPath Advanced RPA Developer v1.0 Exam (UiARD) 認定」

Is there any way to hide the execution of one activity in the logs?
Options are :

A developer uses a For Each Row in Data Table activity to iterate through a sampleDataTable that stores current prices of the product and price at the discount. The developer wants to remove some rows (please see the condition in the If activity) and display, how many rows were left in the datatable. What will be the result of the processing?

Please find the BuildDataTable wizard below:

解説: (GoShiken メンバーにのみ表示されます)
Please select the incorrect statement about partial selectors.

解説: (GoShiken メンバーにのみ表示されます)
A developer implemented a Dispatcher process using the Robotic Enterprise Framework to upload items to a queue.
According to the requirements from the Finance team, all items with Price>10000$ should be processed starting 1st of July 2021 at 8 am, when Q3 starts.
For that, the developer uses an Add Queue Item activity inside an If. What is the correct setting for that activity?

解説: (GoShiken メンバーにのみ表示されます)
A developer is creating a process using the Dispatcher and Performer model. The Dispatcher uses the Bulk Add Queue Items activity to upload items to an Orchestrator queue. Which type of design is best-suited for the automation of this Dispatcher?

A developer wants to design a process in which multiple decision points will be used to accommodate complex scenarios.
In UiPath Studio, which recommended type of workflow meets this requirement?

A developer configured the properties for a Type Into activity on an element inside a web page as shown in the following graphic. During runtime, the selector is invalid and does not match any element on the web page. What occurs during the execution of the sequence?

解説: (GoShiken メンバーにのみ表示されます)
A developer wants to use a Basic recorder to capture several clicks on a website. What type of selectors will be generated during recording?

解説: (GoShiken メンバーにのみ表示されます)
In a Robotic Enterprise (RE) Framework project that is connected to Orchestrator, what is the correct sequence of steps if an application exception occurs on a Queue Item in the Process Transaction state?
NOTE: Drag the Description found on the "Left" and drop on the correct Step Sequence found on the "Right".
正解:
Consider three GenericValue variables, var1 with the default value of "3 apples", var2 with the default value of "5 mangos", and the result, which is the output of an Assign Activity with the var1 + var2 expression. What is the value of the resulting variable Options are :

You recently observed a developer using the SecureString variable type in their workflow. What is a UiPath best practice relative to the use of SecureString?

Which of the following activities searches for a UI element by using a position relative to a fixed element?

解説: (GoShiken メンバーにのみ表示されます)
How should exceptions be handled? Select all the options that apply.
Options are :

You want to identify a selector for a button in an application. The selector will be used as the target in a Click activity.
In order to ensure the Click activity executes as intended, how many elements should the selector be valid for at runtime?

A developer added six Queue Items to your queue on 15.04.2021. What is the correct sequence in which these Queue Items will be processed?

解説: (GoShiken メンバーにのみ表示されます)
In a UiPath project, a developer uses a Click Button activity. A desktop application should be opened as a result of clicking the button. Based on best practice, what should the developer use to ensure: (1) the button element is clicked and (2) the application is opened correctly?

If a large item collection is processed using For Each, which activity enables you to efficiently exit the loop after a specific moment?
Options are :

You are developing a .xaml file to interact with multiple fields of a web page. You want to Auto Empty the fields that require input.
Which input method(s) will automatically empty the target input fields?