3V0-32.21試験無料問題集「VMware Advanced Design VMware Cloud Management and Automation 認定」

A healthcare company has mandated that all IP and DNS entries be allocated from an existing third-party IPAM solution. Also, for auditing purposes, all systems must handle user authentication via the existing open source LDAP directory.
When considering a logical design for this scenario, which is true about the dependency relationships of these systems?

An architect has been engaged to update an operations management solution design to include VMware vRealize Suite Lifecycle Manager (vRSLCM) so that the support team can reduce the complexity of environment and content management activities. The customer has provided the following information with regards to the existing environment:
There are four environments for business applications:
Development
Staging
Production
DR
The solution consists of two well-connected data centers (with low latency, high bandwidth links).
All Production workloads and management tooling are deployed to Data Center 1 (DC1).
All Staging, Development and DR workloads run in Data Center 2 (DC2).
Each physical data center has one vCenter Server and a sufficient number of hosts for workload and management.
There are two separate VMware vRealize Operations (vROps) clusters, one in each data center location.
Currently all content is developed in the DC2 vROps cluster before being manually imported into the DC1 vROps cluster.
Which two design decisions should the architect include in the solution? (Choose two.)

What are two requirements for deploying a small deployment of vRealize Automation? (Choose two.)

Which recommendation should an architect make when designing a highly available vRealize Operation (vROps) cluster?

An architect is responsible for creating a new design to centralize the logging infrastructure for an existing vSphere environment. The key stakeholder in the project has provided the following list of requirements:
The management solution must forward all logs to the existing centralized Security Incident and Event Management (SIEM) solution.
The management solution must be a minimum of N + 1 resilient.
The management solution must provide the ability to view at least 2 months of live data.
The management solution must meet a monthly uptime SLA of 99.9%.
The management solution must support the collection of logs from ten geographically separated data center locations.
The management solution must support the collection of a minimum of 10,000 events per second.
Given the information from the stakeholder, which two statements would be considered functional requirements? (Choose two.)

An organization's cloud team would like to reduce template sprawl. Below are the applications they want to deploy using cloud templates:
MS SQL and Web IIS applications on OS types Windows 2016 and Windows 2019 Oracle WebLogic and Oracle DB applications on OS types RHEL7 and RHEL 8 Which two options would meet these requirements? (Choose two.)